Update for the Drainage System

Trays803These are three of four trays I made this weekend at Whitehawk.  I used the table saw to rip strips from 4’x8′ sheet of 1/4″ plastic PVC Sheet, then used the chop saw to cut them to length.  I will paint and plumb them this week, and see how things go.  If they look OK, I’ll make seven more next weekend.

Advertisements
This entry was posted in Infrastructure and tagged . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s